Plan the production calendar before the launch.

Work backwards from the date you need stock. Keep development, approvals, material sourcing and shipping visible in the same plan.
Distinguish arrival from dispatch
A production completion date is not the same as a warehouse arrival date. Specify your destination and when the goods must be available. Discuss shipping arrangements and responsibilities before building the launch plan around a date.
Separate the project into stages
- Brief review and specification alignment.
- Fabric and trim sourcing or confirmation.
- Sample development and review.
- Revisions and final approval.
- Production, inspection and packing.
- Dispatch, transit and destination clearance.
Some tasks can overlap; others depend on an approval. Ask which decisions unlock the next stage rather than assuming every activity starts immediately.
Give approvals an owner
Decide who will approve fabric, colour, fit, labels and packing. Consolidate feedback, record the approved reference and identify when the specification is frozen. Late changes can affect both cost and timing.
Confirm minimums precisely
A quoted minimum can apply to the whole order, one style, one colour or a fabric purchase. Clarify its scope before dividing quantities. Ask how custom fabrics and trims change the development and production plan.
Review the risks before committing
Material availability, sample revisions and transport arrangements can change a schedule. Ask which dates are estimates and which have been confirmed. Leave a project-specific allowance for outstanding decisions instead of relying on a universal lead-time promise.
Send the information needed for a useful schedule
Include your styles, quantities by colour, fabric requirements, sample status, destination and intended arrival date. A realistic timeline should be agreed alongside the quotation and approved specification.